Forward deployed AI engineering for founder-led B2B SaaS
Your first autopilot, shipped in ten days.
One workflow in your product that does the work instead of helping a user do it. Fixed scope, $5,000, full refund if it doesn't run.
Run by the author of Forward Deployed AI Engineering. Ex-CEO/CPO of Nivo (acquired, 200K+ users). Building Vectig in public.
- Day 1
- Brief signed, one sentence
- Day 5
- Prototype on your data, or refund
- Day 10
- Pull request in your repo
Next kickoff: · One Sprint at a time
Copilot or autopilot
A copilot is a tool a professional uses to do the work faster. They stay responsible for the result and your customer pays per seat. An autopilot does the work and hands back a finished result with a score. A person approves it instead of producing it, and the buyer pays for the work.
The terms come from Sequoia's essay "Services: The New Software" (Julien Bek, March 2026). The Sprint ships the autopilot version of one workflow you already touch, run alongside the product your users keep. It is scoped on Day 1, proven on your data by Day 5, and in your repo on Day 10.
In a first Sprint, a person still approves anything that leaves the company. Autonomy is earned later, once the rubric scores hold.
10
Business days, Day 1 to handoff
$5,000
Fixed price, half on signing
Day 5
Prototype on your data, or full refund
1
Active Sprint at a time
What lands in your repo on Day 10.
Three artifacts your team keeps and runs without us. The code is yours; so is the standard it was built to.
Fig. 2 · The pull request, an example feat(support): ticket summarizer v1
+1,284 −36 · 14 files · evals passing
Ready to merge · reviewed by your team
Working code in your repo
A staging deploy or a production-ready pull request, with prompts and model settings in a config file your team owns.
Fig. 3 · The output rubric - 1
- 2
- 3
- 4
- 5
4: good with minor edits.
A 1-to-5 rubric with worked examples
Written before the code, scored on your data. Your team grades every future change against the same scale. The rubric is also the acceptance test, so "the workflow runs" has a score attached, and so does the refund.
Fig. 4 · The Brief, signed on Day 1 For a founder, when the month-end close happens, the workflow will pull the metrics and draft the investor update and produce a send-ready draft, so that the update takes 8 minutes instead of 90.
A one-sentence Brief, signed on Day 1
User, trigger, output and value line in five brackets. If they won't fill, the Sprint doesn't start.
Scope, validate, deliver.
Day 1
Scope
One signed sentence: for whom, on what trigger, producing what output, worth what. If the five brackets won't fill on Day 1, the Sprint isn't ready, and we say so.
Days 2 to 5
Validate
The output rubric is written before the code. A working prototype runs on your real data by Day 5, or you stop and get your money back.
Days 6 to 10
Deliver
Edge cases, error states, prompt tuning against the rubric. Day 10 is a staging deploy or a production-ready pull request, plus the playbook your team runs without us.
Is this you?
- You posted an AI engineer or forward deployed engineer role and it has been open for more than a month.
- You paid a contractor or agency for an AI build and it never reached production.
- Your AI prototype worked on five examples, then stalled.
- You know which workflow, but can't spare two engineers for six weeks.
- A vendor's deployment team quoted you an enterprise minimum.
- Investors keep asking what your AI story is.
If one of these is yours, the Scoping Call settles in fifteen minutes whether a Sprint fits.
What we can show you today
No Sprint has closed yet. The workflow below runs as an autopilot inside Vectig, the investor-update product our founder builds in public: a startup's numbers come in from Stripe and Mercury, the draft is assembled in its founder's voice and diffed against last month, the founder fills three fields, and the update goes out with per-investor open and click tracking. The figures come from his own test runs during development, not from a customer. That is why the price is $5,000 through the November 17 kickoff and why the guarantee is a full refund.
As Sprints complete, their numbers replace these.
| Metric | Before | After | Sample |
|---|---|---|---|
| Investor update draft, open to send | 90+ minutes | 8 minutes | Test runs during development |
| Output rubric score | Not measured | 4 of 5 across accuracy, clarity, honesty, ask coverage | 30 test runs |


The method is published. The engineer is the author.
Nasser Ghanemzadeh is a former CEO and CPO with 17 years of product leadership. He exited Nivo, a B2B fintech with 200K+ users, after growing revenue 450%, was founding head of product at Pangouan, and founded the Finnova accelerator, which he ran as its first managing director. He builds Vectig with Claude Code and MCP every day and runs every Eupraxic Sprint himself. Eupraxic is one engineer for now; the method is written down so it will not stay that way.
The practice of shipping.
Questions founders ask
Is Eupraxic the same as the FDE Sprint?
No. Eupraxic is the firm; the FDE Sprint is its flagship engagement. An advisory retainer and a fractional AI lead come after a first Sprint, when there is a shipped workflow to build on.
Who is the Sprint for?
Founder-led B2B SaaS companies with 5 to 50 people, paying customers, real data inside the product, and one decision-maker who can answer within a business day. Not indie hackers, not enterprises with formal procurement.
What is the difference between a copilot tool and an autopilot workflow?
A copilot helps one of your users do the work and leaves them responsible for the result. An autopilot does the work and hands back a finished result with a score, which a person approves instead of producing. The Sprint ships the second kind, for one workflow, next to the product your users keep using.
My team could build this with Claude Code. Why pay?
They probably could build the demo. The Sprint is the part after the demo: the rubric written before the code, the prototype scored on your real data by Day 5, the edge cases and error states, and a pull request your engineers review and own. If the workflow doesn't run to the Brief's acceptance criteria by Day 10, you get a full refund.
Who is responsible when the output is wrong?
"Wrong" is defined on Day 1 by the rubric and the acceptance criteria, so it is measured rather than argued about. Through Day 10 the Sprint is responsible for meeting them, and the refund covers the case where it doesn't. From Day 10 the code, prompts, and settings are in your repo, with the rubric and a playbook, so your team can keep scoring it.
What happens after Day 10?
You own the pull request, the config, the rubric, and the playbook. We suggest running the workflow for one account first and widening from there. A second workflow is another Sprint at your first price, booked within six months. Help with the rollout is scoped as a separate engagement and is never a condition of the Sprint; there is no retainer required to keep the first one running.
What does it cost?
$5,000 for Sprints kicking off through Tuesday November 17, 2026, and $7,500 from the Tuesday December 1 kickoff. Half on signing, half on Day 10. The price is set against what the workflow replaces: a contractor month, an engineer role you haven't filled, or six weeks of two engineers. A two-hour Discovery Day is available for $500, credited to the Sprint.
What does the Discovery Day produce?
Two hours with you and the person who does the workflow today. We write the workflow out step by step and mark each step as rule-following or judgement, draft the one-sentence Brief and a first rubric, note what the workflow replaces and what that costs you now, and give a go or no-go. You keep the one-page memo. The $500 is credited to the Sprint.
How quickly can a forward deployed engineer start?
Kickoffs are on fixed dates two weeks apart, and each one has a deposit due five days before it. The next open kickoff is Tuesday December 1, with the deposit due Thursday November 26. There is no hiring step: Nasser runs every Sprint himself. A prototype runs on your data by Day 5, and the workflow ships on Day 10.
What happens if it doesn't ship?
A full refund at either of two checkpoints: no working prototype on your data by Day 5, or the workflow in the signed Brief not running to its acceptance criteria by Day 10.
Why hire Eupraxic instead of using our own engineers?
Ten business days instead of six weeks of roadmap displacement, and a fixed price on a fixed scope. Your engineers review the pull request and own it; they do not stop shipping their roadmap to build it.
What stack do you work in?
Yours. The Sprint integrates with your product, your data sources and your AI provider, whether that is Anthropic, OpenAI, Bedrock or Vertex. Ten days is too short to introduce new infrastructure, so we don't.
Want one useful AI workflow in your product?
Score your workflow in two minutes, then book a 15-minute Scoping Call. If it fits, you leave the call with a Brief draft and a kickoff date.